QORVANIX

Zircon Multi-Tier — Three Level

244.500,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Shelving — a metre of order at a time

The Zircon stacks shelving into architecture: walk-on tiers that turn building height into owned floor, stairs and gates to standard, and coordination drawings that keep sprinklers and lighting on speaking terms.

Shelving earns its keep in millimetres: shelves that hold their stated load without the sag that slowly unsorts a warehouse, uprights slotted on a 25 mm pitch, and finishes — powder or galvanise — chosen for decades of hands and totes. Every bay ships with its load label, because 'it looked strong' is not a number.

Design & Craft

  • Corner, filler and free layout drawing service included
  • Two years parts and labour; parts stocked fifteen
  • Upright pitch 25 mm; reposition without tools on boltless
  • Stated shelf and bay loads on the label, tested with margin
  • Rolled shelf edges — pickers keep their knuckles
  • Multi-tier turns building height into floor you own

Specifications

Levels Ground + 2
Area To 200 m² per level
Decks Steel / grating / board
Access Stairs + pallet gates to standard
Engineering Eurocode pack included
Weight ≈ 4677 kg
Install Our crews, days not months

Care

Keep the load plaques posted and respected, edge gates closed, and stair nosings intact. Inspect bolted connections at year one, then per the documentation pack. Alterations only through our engineers — floors are systems, not shelving.

Questions, Answered

Can it move if we relocate?
Yes — bolted systems dismantle and re-certify at the new site; our engineers re-calculate for the new slab and use.

How disruptive is installation?
Days, not months: pre-engineered components, our own crews, and lifts planned around your operation. The site survey sets the schedule honestly.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.