Vigil Multi-Tier — Three Level
Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.
QORVANIX Shelving — a metre of order at a time
The Vigil stacks shelving into architecture: walk-on tiers that turn building height into owned floor, stairs and gates to standard, and coordination drawings that keep sprinklers and lighting on speaking terms.
Boltless does not mean casual. Our rivet and clip systems assemble with a mallet and a level, hold their rated loads with certified margin, and reconfigure without a single sheared screw. Steel is pre-galvanised or powder-coated; shelf edges are rolled so pickers' hands stay whole.
Design & Craft
- Pre-galvanised or powder-coated steel throughout
- Multi-tier turns building height into floor you own
- Stated shelf and bay loads on the label, tested with margin
- Upright pitch 25 mm; reposition without tools on boltless
- Stairs, gates and edge protection engineered to standard
- Deck options: steel, grating or chipboard by trade
Specifications
| Levels | Ground + 2 |
| Area | To 200 m² per level |
| Decks | Steel / grating / board |
| Access | Stairs + pallet gates to standard |
| Engineering | Eurocode pack included |
| Weight | ≈ 3132 kg |
| Install | Our crews, days not months |
Care
Keep the load plaques posted and respected, edge gates closed, and stair nosings intact. Inspect bolted connections at year one, then per the documentation pack. Alterations only through our engineers — floors are systems, not shelving.
Questions, Answered
How disruptive is installation?
Days, not months: pre-engineered components, our own crews, and lifts planned around your operation. The site survey sets the schedule honestly.
Do you handle permits and building control?
We deliver the full documentation pack — calculations, drawings, certificates — and support your building-control process; many CZ installs need only notification.
The QORVANIX Promise
Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.