QORVANIX

Tenax Boltless Run — 3 Bay

30.500,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Shelving — a metre of order at a time

The Tenax run assembles with a mallet and a level and then simply refuses to be the problem: rivet connections holding stated loads, shelves that repitch in seconds, and edges rolled so hands survive the honesty.

Boltless does not mean casual. Our rivet and clip systems assemble with a mallet and a level, hold their rated loads with certified margin, and reconfigure without a single sheared screw. Steel is pre-galvanised or powder-coated; shelf edges are rolled so pickers' hands stay whole.

Design & Craft

  • Half-depth and divider options per module
  • Rolled shelf edges — pickers keep their knuckles
  • Pre-galvanised or powder-coated steel throughout
  • Two years parts and labour; parts stocked fifteen
  • Stated shelf and bay loads on the label, tested with margin
  • Mallet-and-level assembly in minutes per bay

Specifications

Bays 3
Shelf load 300 kg
Pitch 25 mm, tool-free
Assembly Mallet + level, minutes
Finish Galvanised or RAL 7016
Weight ≈ 67.6 kg
Warranty 2 years, parts stocked 15

Care

Wipe shelves dry after spills, respect stated shelf loads, and re-level feet after the first month of settling. Clips and rivets are stocked spares; a bay reconfigures in minutes with a mallet and patience.

Questions, Answered

How fast does a bay assemble?
Boltless bays assemble with a mallet and a level in minutes; bolted runs take longer and hold forever. Both ship with stated shelf and bay loads on the label.

Can shelves be repositioned?
Yes — 25 mm pitch on the uprights, no tools on boltless systems. Loads per shelf stay as stamped regardless of position.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.