QORVANIX

Statio Trolley — Heavy Tow

15.890,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Workshop — where repairs stop wandering

The Statio carries the workshop to the work: castors rated for the load and the floor, brakes that hold on the ramp, and bumpers exactly where door frames will test them.

A workbench is a machine with no moving parts: welded box-section legs, tops in beech, oiled multiplex or galvanised steel rated in stated kilograms, and height options set for real spines. Drawers run on ball-bearing slides rated in cycles, not adjectives, and every bench takes vices, rails and rebuilds for decades.

Design & Craft

  • Oil, coolant and Monday-proof coatings
  • Castors rated for load and floors, brakes that mean it
  • Shelf and drawer mixes configurable per trolley
  • Perforated backs on standard pitch take the tool wall
  • Tows and totes standard-moduled to the shelving

Specifications

Format Tow frame + deck
Capacity 800 kg
Castors Rated, braked, floor-kind
Bumpers Corner, door-frame height
Weight ≈ 118 kg
Warranty 2 years, castors stocked 15

Care

Keep drawer loads within rating and slides stay silent for decades. Perforated panels take standard hooks — do not drill the frame. Touch-up paint and spare slides are catalogue parts.

Questions, Answered

Are drawers rated at full extension?
Yes — 100% extension slides carry their stated load fully open, cycle-rated. That is what separates workshop furniture from furniture.

Beech, multiplex or steel top?
Beech for edge tools, multiplex for general fitting, galvanised steel for welding-adjacent and washdown areas. Swappable later — tops are parts.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.