Stabilis Kitting System
Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.
QORVANIX Automated — floors that fetch
The Stabilis keeps production breathing: tote shuttles buffering work-in-progress between takts, kitting lanes sequencing parts to the line's heartbeat, and throughput stated in totes per hour — measured, then promised.
Automated storage is a building that moves: vertical lifts and carousels with drives sized for duty cycles rather than brochures, positioning measured in millimetres, and controls that speak to your WMS in standard protocols. We commission on site, train your team, and leave the maintenance schedule printed and true.
Design & Craft
- Tote shuttles buffer work-in-progress between takts
- Positioning in millimetres; inventory counted by controller
- Safety curtains and interlocks to machinery directives
- Drives sized for duty cycles, not brochures
- Kitting lanes sequence parts to the line's heartbeat
- Commissioned on site; operators trained on your unit
Specifications
| Scope | Kitting: lanes + sequence racks |
| Throughput | Totes/hour, measured |
| Interface | Standard conveyor + WMS |
| Modules | Totes match shelving family |
| Safety | Certified guarding |
| Weight | ≈ 2647 kg |
| Service | Contract, hours-stated response |
Care
Train every new operator on the handover materials, keep the controller's error log unedited, and call service at the first repeat fault. Uptime is a discipline shared between your cleaning rota and our spares shelf.
Questions, Answered
How accurate is the inventory?
The controller counts every movement; cycle counts reconcile in the software. Most sites retire their annual full count within a year.
What about power and floor requirements?
Each unit lists its supply, footprint and slab loading; our survey confirms anchoring and flatness before anything ships.
The QORVANIX Promise
Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.