QORVANIX

Sazava Crossover Platform

74.500,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Mezzanines — the free floor above the floor

The Sazava puts people at task height without ladder optimism: grating that grips and drains, kick plates and rails by the book, and tool trays exactly where reaching hands expect them.

Platforms and walkways are built for the two audiences that matter: the people on them and the inspectors under them. Grating that drains and grips, kick plates and handrails to standard, and connections designed for inspection — nothing hidden, nothing hoped.

Design & Craft

  • Tool trays and rail options where hands expect them
  • Columns and beams engineered to your loads and slab
  • Crossovers clear conveyors and pipes to standard
  • Stairs, gates and edge protection to standard included
  • Grating drains and grips; kick plates by the book

Specifications

Format Crossover, dual stairs
Deck Grating, grip + drain
Edge Kick plates + handrails standard
Extras Tool trays, rail options
Weight ≈ 510 kg
Papers Certificates included

Care

Sweep grating so drainage stays honest, replace worn nosings promptly, and log point loads that were not in the design brief before they happen, not after. The yearly structural walk-through is bookable with one email.

Questions, Answered

How disruptive is installation?
Days, not months: pre-engineered components, our own crews, and lifts planned around your operation. The site survey sets the schedule honestly.

Can it move if we relocate?
Yes — bolted systems dismantle and re-certify at the new site; our engineers re-calculate for the new slab and use.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.