Kastel Crossover Platform
Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.
QORVANIX Mezzanines — the free floor above the floor
The Kastel puts people at task height without ladder optimism: grating that grips and drains, kick plates and rails by the book, and tool trays exactly where reaching hands expect them.
A mezzanine is the cheapest floor you will ever buy — if it is engineered like a real one. Ours are: columns and primary beams calculated to Eurocodes, decking chosen for the load and the trade, stairs and edge protection to standard, and the full documentation pack for building control.
Design & Craft
- Installed by our crews in days, around your operation
- Eurocode calculations; documentation pack for building control
- Tool trays and rail options where hands expect them
- Grating drains and grips; kick plates by the book
- Crossovers clear conveyors and pipes to standard
Specifications
| Format | Crossover, dual stairs |
| Deck | Grating, grip + drain |
| Edge | Kick plates + handrails standard |
| Extras | Tool trays, rail options |
| Weight | ≈ 498 kg |
| Papers | Certificates included |
Care
Keep the load plaques posted and respected, edge gates closed, and stair nosings intact. Inspect bolted connections at year one, then per the documentation pack. Alterations only through our engineers — floors are systems, not shelving.
Questions, Answered
How disruptive is installation?
Days, not months: pre-engineered components, our own crews, and lifts planned around your operation. The site survey sets the schedule honestly.
What loads can the floor take?
Designed to your brief and plaqued accordingly — typical light storage runs 350–500 kg/m²; heavier is a design choice, not a hope.
The QORVANIX Promise
Two years parts and labour, fifteen years of components on the shelf, and certified annual rack inspections to EN 15635 bookable with one email.