QORVANIX

Horreum Pallet Gate

58.500,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Safety — steel that takes the hit

The Horreum keeps edges honest during the exact moment they get dangerous: pallet gates that hold one side closed by mechanism while the other loads, and self-closers on the stair heads people forget.

Protection steel is the cheapest accident you will ever have: column guards and barriers engineered to absorb stated energies, anchored to the slab with calculated fixings, and painted in signal yellow that means what it says. Sacrificial by design — the guard crumples, the rack does not.

Design & Craft

  • Self-closing personnel gates for ladder and stair heads
  • Photographs well in the audit report — and reads better
  • Two years parts and labour; guards stocked fifteen
  • Pallet gates: one side always closed, by mechanism
  • Rated to absorb stated energies — sacrificial by design

Specifications

Format Pallet gate, tilt mechanism
Logic One side always closed
Papers Certificate per gate
Hinges Stocked forever
Weight ≈ 153 kg
Warranty 2 years; parts stocked 15

Care

Test gate operation weekly in live aisles, keep barrier fixings torqued, and repaint scuffs with the supplied signal coat. Guards are sacrificial by design: budget them like brake pads, not furniture.

Questions, Answered

How do I plan a marking layout?
Send a floor plan; we return a 5S marking scheme with quantities, colours to your convention and the order list.

Will the barrier actually stop a forklift?
Rated barriers state absorbed energy and tested impact classes; guards are sized to your truck masses and speeds. Send your fleet list and we specify honestly.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.