Gravis Multi-Tier — Three Level
Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.
QORVANIX Shelving — a metre of order at a time
The Gravis stacks shelving into architecture: walk-on tiers that turn building height into owned floor, stairs and gates to standard, and coordination drawings that keep sprinklers and lighting on speaking terms.
Boltless does not mean casual. Our rivet and clip systems assemble with a mallet and a level, hold their rated loads with certified margin, and reconfigure without a single sheared screw. Steel is pre-galvanised or powder-coated; shelf edges are rolled so pickers' hands stay whole.
Design & Craft
- Stated shelf and bay loads on the label, tested with margin
- Multi-tier turns building height into floor you own
- Upright pitch 25 mm; reposition without tools on boltless
- Lighting and sprinkler coordination drawings included
- Pre-galvanised or powder-coated steel throughout
- Stairs, gates and edge protection engineered to standard
Specifications
| Levels | Ground + 2 |
| Area | To 200 m² per level |
| Decks | Steel / grating / board |
| Access | Stairs + pallet gates to standard |
| Engineering | Eurocode pack included |
| Weight | ≈ 4742 kg |
| Install | Our crews, days not months |
Care
Sweep grating so drainage stays honest, replace worn nosings promptly, and log point loads that were not in the design brief before they happen, not after. The yearly structural walk-through is bookable with one email.
Questions, Answered
Do you handle permits and building control?
We deliver the full documentation pack — calculations, drawings, certificates — and support your building-control process; many CZ installs need only notification.
What loads can the floor take?
Designed to your brief and plaqued accordingly — typical light storage runs 350–500 kg/m²; heavier is a design choice, not a hope.
The QORVANIX Promise
Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.