QORVANIX

Dolomit Trolley — Shelf

49.000,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Workshop — where repairs stop wandering

Trolleys are logistics at walking pace; the Dolomit walks properly — shelf and drawer mixes to your tasks, handles at spine height, and totes that module-match the shelving they came from.

A workbench is a machine with no moving parts: welded box-section legs, tops in beech, oiled multiplex or galvanised steel rated in stated kilograms, and height options set for real spines. Drawers run on ball-bearing slides rated in cycles, not adjectives, and every bench takes vices, rails and rebuilds for decades.

Design & Craft

  • Height options and levelling feet for real floors
  • Welded box-section frames; stated static loads on the plate
  • Oil, coolant and Monday-proof coatings
  • Tows and totes standard-moduled to the shelving
  • Castors rated for load and floors, brakes that mean it

Specifications

Format 3 shelves
Capacity 300 kg
Castors Rated, braked, floor-kind
Bumpers Corner, door-frame height
Weight ≈ 50.9 kg
Warranty 2 years, castors stocked 15

Care

Keep drawer loads within rating and slides stay silent for decades. Perforated panels take standard hooks — do not drill the frame. Touch-up paint and spare slides are catalogue parts.

Questions, Answered

Beech, multiplex or steel top?
Beech for edge tools, multiplex for general fitting, galvanised steel for welding-adjacent and washdown areas. Swappable later — tops are parts.

What load does the bench really take?
Stated static load on the plate — measured with the load spread across the top. Point loads from vices and presses are in the manual, honestly.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.