QORVANIX

Constans Pallet Gate

70.000,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Safety — steel that takes the hit

Gates are choreography in steel; the Constans dances by the book — certified per gate, hinged for decades, and configured so the unsafe state is mechanically unreachable rather than administratively discouraged.

Protection steel is the cheapest accident you will ever have: column guards and barriers engineered to absorb stated energies, anchored to the slab with calculated fixings, and painted in signal yellow that means what it says. Sacrificial by design — the guard crumples, the rack does not.

Design & Craft

  • Certificates per gate; hinges stocked forever
  • Two years parts and labour; guards stocked fifteen
  • Self-closing personnel gates for ladder and stair heads
  • Mezzanine edges protected during loading, always
  • Rated to absorb stated energies — sacrificial by design

Specifications

Format Pallet gate, tilt mechanism
Logic One side always closed
Papers Certificate per gate
Hinges Stocked forever
Weight ≈ 122 kg
Warranty 2 years; parts stocked 15

Care

Replace any guard that has done its job — absorbed energy is spent energy. Check anchor torque after impacts and yearly, keep yellow surfaces clean enough to mean something, and photograph everything for the audit file.

Questions, Answered

Are the gates compliant for mezzanine edges?
Pallet gates keep one side closed at all times by mechanism, meeting edge-protection requirements; certificates ship with each gate.

How do I plan a marking layout?
Send a floor plan; we return a 5S marking scheme with quantities, colours to your convention and the order list.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.