Cerchov Walkway Run
Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.
QORVANIX Mezzanines — the free floor above the floor
The Cerchov climbs and connects by the book: rise-run comfort to standard, handrail and kick-plate logic complete, and landings sized for stretchers because the book thought of that too.
Platforms and walkways are built for the two audiences that matter: the people on them and the inspectors under them. Grating that drains and grips, kick plates and handrails to standard, and connections designed for inspection — nothing hidden, nothing hoped.
Design & Craft
- Stair towers to standard rise-run comfort
- Galvanised outdoor variants carry their own certificates
- Two years parts and labour; components stocked fifteen
- Installed by our crews in days, around your operation
- Columns and beams engineered to your loads and slab
Specifications
| Format | Walkway: runs to 30 m |
| Comfort | Standard rise-run |
| Edge | Handrail + kick plates complete |
| Outdoor | Galvanised, certified |
| Weight | ≈ 924 kg |
| Papers | Certificates included |
Care
Keep the load plaques posted and respected, edge gates closed, and stair nosings intact. Inspect bolted connections at year one, then per the documentation pack. Alterations only through our engineers — floors are systems, not shelving.
Questions, Answered
What loads can the floor take?
Designed to your brief and plaqued accordingly — typical light storage runs 350–500 kg/m²; heavier is a design choice, not a hope.
How disruptive is installation?
Days, not months: pre-engineered components, our own crews, and lifts planned around your operation. The site survey sets the schedule honestly.
The QORVANIX Promise
Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.