QORVANIX

Brenta Crossover Platform

97.000,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Mezzanines — the free floor above the floor

Crossovers end the long way round; the Brenta clears conveyors and pipework to standard, lands on stretcher-sized platforms, and turns a daily detour into eleven honest steps.

Platforms and walkways are built for the two audiences that matter: the people on them and the inspectors under them. Grating that drains and grips, kick plates and handrails to standard, and connections designed for inspection — nothing hidden, nothing hoped.

Design & Craft

  • Tool trays and rail options where hands expect them
  • Eurocode calculations; documentation pack for building control
  • Two years parts and labour; components stocked fifteen
  • Crossovers clear conveyors and pipes to standard
  • Columns and beams engineered to your loads and slab

Specifications

Format Crossover, dual stairs
Deck Grating, grip + drain
Edge Kick plates + handrails standard
Extras Tool trays, rail options
Weight ≈ 574 kg
Papers Certificates included

Care

Sweep grating so drainage stays honest, replace worn nosings promptly, and log point loads that were not in the design brief before they happen, not after. The yearly structural walk-through is bookable with one email.

Questions, Answered

Do you handle permits and building control?
We deliver the full documentation pack — calculations, drawings, certificates — and support your building-control process; many CZ installs need only notification.

How disruptive is installation?
Days, not months: pre-engineered components, our own crews, and lifts planned around your operation. The site survey sets the schedule honestly.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.