Berounka Cantilever — Heavy Run
Tax included where applicable. Delivery calculated at checkout.
QORVANIX Racking — tonnes, filed vertically
Cantilever is the honest answer to anything longer than a pallet; the Berounka answers with stamps — arm loads, column loads, and galvanised outdoor versions that carry their own weather-grade calculations.
These frames are built the way bridges are built — with numbers first: section moduli chosen with margin, baseplates and anchors specified for a sound concrete slab, and beam connectors that lock with an audible, inspectable click. Galvanised options run outdoors and in coolers; the documentation runs everywhere.
Design & Craft
- Designed to EN 15512; manufacturer's documentation per configuration
- Long goods: tube, timber, profiles, boards — held straight
- Powder coat RAL 5010 / 7016 or hot-dip galvanised
- Arms rated per arm and per column, stamped both ways
- Anchors sized to your slab; torque schedule documented
- Cold-rolled steel; welds inspected to class by the manufacturer
Specifications
| Run | 5 columns, 6 m |
| Arm load | 600 kg |
| Arm pitch | Slotted, adjustable loaded |
| Goods | Tube, timber, profiles, boards |
| Finish | RAL 5010 |
| Weight | ≈ 675 kg |
| Documents | Manufacturer's data + load notices |
Care
Keep load notices legible, anchors torqued to schedule, and never exceed stated beam loads even briefly. Damaged components are replaced, never straightened — racking is repaired by part, not by apology.
Questions, Answered
Do you install and anchor it?
No — we do not provide installation. Racking must be anchored as the instructions require; have assembly done by an experienced racking installer and keep the documentation for your insurer.
Is the racking certified for my loads?
Every configuration is designed by its manufacturer to EN 15512 and ships with per-bay load notices. Compare the stated loads with your pallet weights before ordering — ask us if you are unsure.
The QORVANIX Promise
Goods ship flat-packed or palletised with the manufacturer's instructions, anchor specifications and load notices — the paperwork your insurer and auditor will ask for stays with the goods.