QORVANIX

Adamello Walkway Run

98.000,00 Kč

Tax included where applicable. Delivery, anchoring and commissioning arranged by the site office.

Calculated to ENStatic calculation and load plaques in the pack.
Anchored by our crewSurveyed, levelled, torqued — and plaqued.
Inspected for lifeEN 15635 inspections; parts stocked fifteen years.

QORVANIX Mezzanines — the free floor above the floor

Walkways are streets for buildings; the Adamello paves them — galvanised outdoor variants with their own certificates, grating that grips in rain, and connections designed to be inspected, not hoped about.

A mezzanine is the cheapest floor you will ever buy — if it is engineered like a real one. Ours are: columns and primary beams calculated to Eurocodes, decking chosen for the load and the trade, stairs and edge protection to standard, and the full documentation pack for building control.

Design & Craft

  • Galvanised outdoor variants carry their own certificates
  • Stair towers to standard rise-run comfort
  • Columns and beams engineered to your loads and slab
  • Two years parts and labour; components stocked fifteen
  • Landings sized for stretchers, not just feet

Specifications

Format Walkway: runs to 30 m
Comfort Standard rise-run
Edge Handrail + kick plates complete
Outdoor Galvanised, certified
Weight ≈ 947 kg
Papers Certificates included

Care

Sweep grating so drainage stays honest, replace worn nosings promptly, and log point loads that were not in the design brief before they happen, not after. The yearly structural walk-through is bookable with one email.

Questions, Answered

Can it move if we relocate?
Yes — bolted systems dismantle and re-certify at the new site; our engineers re-calculate for the new slab and use.

How disruptive is installation?
Days, not months: pre-engineered components, our own crews, and lifts planned around your operation. The site survey sets the schedule honestly.

The QORVANIX Promise

Storage is commissioned, not couriered. Our crews anchor, level, torque and plaque every installation — and hand over the paperwork your insurer and auditor will ask for.